We have successfully completed a wide variety of construction jobs ranging from reconstruction and new projects. Please view our pictures of our recently completed
projects.
Boss Pro-Karting - BrookPark, Ohio. A 36,000 square foot facility placed and finished by RMH. Janotta & Herner was the general contractor.
American Timber and Steel - Nacogdoches, Texas. RMH placed and finished 30,000 SF of 8" Reinforced Concrete Pavement.
Erie County - Plank Road. RMH installed reinforced concrete footers and headwalls for the new culvert. Buckeye Excavating was the prime contractor.
Oberlin - North Prospect Street - RMH removed old street and made upgrades to old storm sewer. RMH slipped concrete curb and gutter.
Hy-Miler Convenient Store - Sandusky, Ohio. RMH placed and finished 3200 SF slab-on-grade. RMH installed acetone dye stain and epoxy floor coating on the interior of the store. RMH also placed and
finished 34,000 SF parking lot.
NASA Plum Brook Main Gate Facility - Sandusky, Ohio. RMH placed over 4500 CY of pavement, curb, and islands at the new facility.
Ganley Chevrolet - Brookpark, Ohio - Janotta & Herner, Inc.
RMH placed over 40,000 SF of slabs-on-gade and 9000 + SF of slab-on-deck. RMH placed approximately 2800 FT of type 6 curb and 6400 SF of combination curb and walk. RMH placed over 17,000 SF
of pervious concrete.
South Professor Street - Oberlin, Ohio - Erie Blacktop, Inc.
The project included over 4000 FT of underdrain and storm sewer repair. RMH placed over 5000 FT of type 6 concrete curb, curb ramps, concrete aprons, and walk.
NASA Plum Brook Station - New Main Gate Facility - Sandusky, Ohio
The project includes excavation, foundations, slabs-on-grade.
Americraft Carton, Inc. - Norwalk, Ohio
This design-build project included design and drawings by John Burkin and construction by RMH. The foundation construction for the KBA 105 was completed in a timely manner, adding several jobs to
the community after the printing machine became operational.
St. Anthony's Parish - Basement Waterproofing - Milan, Ohio
The project consisted of basement waterproofing, storm sewer installation, and sidewalks.
Cedar Point - Golden Dorm Parking Lot - Sandusky, Ohio
THe project consisted of over 31,000 SF of 6" parking lot with 6" of #304 limestone sub-base. The majority of the project was completed in December of 2013 (including a "bunch" of solar
blankets.)
Maple City Ice - Norwalk, Ohio - Wilhelm Construction
RMH placed and finished 13,800 SF of slab-on-grade.